Using the Scrum framework requires a change in mindset from traditional methods. The central focus has moved from scope in Waterfall methods to achieving maximum business value in Scrum. While in Waterfall, cost and schedule are altered to ensure the desired scope is achieved, in Scrum, quality and constraints can be altered to achieve the…